Monday, July 9, 2012

July 9, 2012 - Part 2

As you can see from the picture below, Central Wisconsin Heating was here today.  Although, nothing with heating was done today.  All electrical (Mark Gantner) and plumbing (Chris Freund).


Downstairs bathroom doorway is framed.  Jay also framed in a closet in this bathroom too. (no pic)

Boo boo  from yesterday (wall buckling) was fixed by splinting these studs.

Light switches and outlets were installed in bathroom and laundry.

Two of the canned lights in the laundry room.

Last but not least, the kids had their ceiling lights installed today!

I took this picture of Carter's switch (Carlee has the same one).  For those not familiar, the contraption on the right is a light censored night light!  I know!!  How brilliant!  We had some of these installed in the upstairs hallway (towards the floor for walking in the dark).  I loved them so much I asked Mark about getting these in their bedrooms for their night lights.  My kids always need night lights so this was a super idea to help illuminate their room just a tad.  They give off just the right amount of light.  Bye-bye to plug in night lights.  I love Mark!


Both kids also had these lights installed in their ceiling.  Bye-bye lamps....hello MORE space!

Hope we have a busy day tomorrow too!