June 24, 2012
Today, there was some more work done in the basement (those unseen things that are extremely important) as well as more demolition in the main level bathroom.
The first two pictures are of Jay preparing to jack up the floor.
Bye-bye to the shower unit surrounding our tub in the downstairs bathroom. Thank goodness we have the camper we're staying in! |
There it goes! |
A view into the downstairs bathroom, from the northeast room. The tub will be next! Our plans here for this bathroom is turning it into a 3/4 bathroom. Just a stool, sink and shower unit only. |
I think this house is thanking us for all the weight we've taken off of it.
No comments:
Post a Comment