Thursday, February 21, 2013

February 21, 2013

Just a little bit behind, aren't I?  We're closing in on the first phase being complete.  The later part of 2012, we added some fixtures in the downstairs bathroom and added another arch between the two rooms on the south side of the house.  Recently, we had some more electric work completed.  See pictures below.



Downstairs bathroom just about finished. 
(Although this picture doesn't show it, the outlets and switches to the left are also completed.)
* * *

The next few pictures show how handy Jay can be.  Tell him I want an arch, and voila.....he's working on it! (Wish it would work that way all the time!)

Moistening the drywall for the arch.
Preparing the drywall for installation using his head....lol




Almost finished....just need to trim it out.


Installing the wall sconces upstairs
Scooby is supervising.  :-)
One of 5 wall sconces located in upstairs hallway.  Aren't they pretty?
Upstairs hallway, north wall.


Upstairs hallway, south wall; shows the last two sconces.
There are now two outside lights in the front entry. 
A little at a time, but that's okay.  In the end, it doesn't matter how long it took because it'll look exactly how we want it.  "Good things come to those who wait." 